Acceptance and handover protocol

ERPoida · Document

A protocol for the acceptance of finished work: what was handed over, defects noted, the date and the signatures of both sides. Acceptance starts the warranty period.

Acceptance Protocol: Project or job

Contractor Contractor
Client Client
Site Site or address
Date of acceptance Date of acceptance
Present names and roles

What is handed over

Describe the finished work and refer to the contract or the quote.

Inspection

  • Work is complete as agreed
  • Work was tested and works
  • Keys, documents and instructions handed over
  • Site is clean and cleared

Defects noted

No. Description Fix by Fixed
1
2

Result

  • Accepted without defects
  • Accepted with the defects noted above, which the contractor fixes by the dates given
  • Not accepted, because: reason

Remarks of the client: text

Acceptance starts the warranty period. Final payment is due as agreed in the contract.

Contractor Client
Place, date
Signature

This template is a starting point, not legal advice. Have it reviewed before use.