# Acceptance and handover protocol

A protocol for the acceptance of finished work: what was handed over, defects noted, the date and the signatures of both sides\. Acceptance starts the warranty period\.

Source: https://erpoida.com/templates/document/handover-protocol/
Languages: de, en

# Acceptance Protocol: [Project or job]

| | |
|---|---|
| Contractor | [Contractor] |
| Client | [Client] |
| Site | [Site or address] |
| Date of acceptance | [Date of acceptance] |
| Present | [names and roles] |

## What is handed over

[Describe the finished work and refer to the contract or the quote.]

## Inspection

- [ ] Work is complete as agreed
- [ ] Work was tested and works
- [ ] Keys, documents and instructions handed over
- [ ] Site is clean and cleared

## Defects noted

| No. | Description | Fix by | Fixed |
|---|---|---|---|
| 1 | | | |
| 2 | | | |

## Result

- [ ] Accepted without defects
- [ ] Accepted with the defects noted above, which the contractor fixes by the dates given
- [ ] Not accepted, because: [reason]

Remarks of the client: [text]

Acceptance starts the warranty period. Final payment is due as agreed in the contract.

| | Contractor | Client |
|---|---|---|
| Place, date | | |
| Signature | | |

> This template is a starting point, not legal advice. Have it reviewed before use.